Case study: Proxmox VE demo cluster (3× node, Ceph, HA)

1. Requirements and parameters

Parameter Value
Number of hosts 3
Purpose demo, learning, development
Hypervisor Proxmox VE (free)
Budget low-cost (~$10,000$15,000)
Storage Ceph (HCI)
HA yes
Location 1 rack, standard office room

2. Server configuration

Based on a combination of the Mini variant (23 hosts, single-socket) and the pure Ceph variant per SERVER-CONFIG.md. Each of the 3 nodes is identical.

2.1 Single node configuration

Component Specification Rationale
CPU 1× AMD EPYC 9224 (24C/48T, 200 W TDP) or Intel Xeon 5418Y (16C/32T) SERVER-CONFIG.md: "Pure Ceph variant: CPU 1× EPYC 92249334 (1224C)". Ceph requires 12 cores per OSD; with 3 OSD + Proxmox + VM, 12+ cores is the minimum.
RAM 128 GB DDR5-4800 (4× 32 GB RDIMM, 1DPC) SERVER-CONFIG.md: "RAM 128256 GB" for Ceph variant. 128 GB is sufficient for demo; 48 GB per OSD + OS + lightweight VMs.
OS disk 2× 240 GB SATA SSD, RAID 1 (HW controller in HBA mode or SW mdadm) "OS: 2× SATA SSD RAID 1" per Ceph variant.
Ceph OSD 3× 960 GB SATA SSD (HBA/IT mode, no HW RAID) "Ceph OSD: 48× NVMe/SATA SSD (RAW, HBA mode)". For demo we reduce to 3 OSD/node. Total 9 OSD in cluster.
NIC 2× dual-port 10 GbE SFP+ (total 4× 10 GbE) "Network: 2× 25 GbE public + 2× 25 GbE cluster". For low-cost we choose 10 GbE (SFP+), the concept remains the same.
BMC 1× 1 GbE (iDRAC / iLO / IPMI) Standard management port, CONNECTIVITY.md.
Form factor 1U rack server (Dell R660, HPE DL360 Gen11, or Supermicro) 19" rack, suitable for 1U.

2.2 CPU choice rationale

KB states for the Mini variant "1× EPYC 4124 (4C) or Xeon E-2400". However, 4 cores is insufficient for Ceph (OSD + Proxmox + VM). Therefore we choose EPYC 9224 (24C) / Xeon 5418Y (16C), which corresponds to the Ceph variant in SERVER-CONFIG.md. The price is higher, but the cluster is functional for real-world testing.


3. Storage variant — Ceph

3.1 Topology

3× Proxmox node ─── each 3× OSD (SATA SSD)
                        │
                   Ceph cluster
                        │
              ┌─────────┼─────────┐
             3× MON    3× MGR    9× OSD

3.2 Ceph configuration

Parameter Value Note
Replication 3 (size = 3, min_size = 2) Standard per STORAGE.md
Failure domain host CRUSH: replication across nodes
Raw capacity 9 × 960 GB ≈ 8.6 TB
Usable capacity ~2.9 TB (8.6 / 3) Sufficient for demo
OSD backend BlueStore Default in Ceph, recommended
MON quorum 3 (1 per node) Minimum for HA
Cache RAM (BlueStore cache) 12 GB per OSD
Network public 2× 10 GbE LACP VM traffic + Ceph frontend
Network cluster 2× 10 GbE LACP Ceph backend replication
MTU 9000 (jumbo frames) Recommended per NETWORKING.md

3.3 Storage layout on disk

/dev/sda         240 GB     OS (RAID 1, mirror with /dev/sdb)
/dev/sdc         960 GB     OSD.0 (RAW, BlueStore)
/dev/sdd         960 GB     OSD.1 (RAW, BlueStore)
/dev/sde         960 GB     OSD.2 (RAW, BlueStore)

3.4 Ceph pool design

Pool PG count Replication Purpose
vms 128 3× VM disks (RBD)
data 64 3× Data volume
backups 32 3× Backups (low priority)

PG count is approximate for demo (9 OSD). Production formula: (OSD_total × 100) / replication_size.


4. Network

4.1 Topology

                    ┌─────────────────┐
                    │  10 GbE Switch   │
                    │  (24-port SFP+)  │
                    └──┬──┬──┬──┬──┬──┘
          ┌─────────────┘  │  │  └─────────────┐
          │                │  │                │
    ┌─────┴─────┐    ┌────┴──┴───┐    ┌───────┴──┐
    │  Node 1   │    │  Node 2   │    │  Node 3  │
    │  4×10GbE  │    │  4×10GbE  │    │  4×10GbE │
    │  ┌──────┐ │    │  ┌──────┐ │    │  ┌──────┐ │
    │  │1GbE  │ │    │  │1GbE  │ │    │  │1GbE  │ │
    │  │BMC   │ │    │  │BMC   │ │    │  │BMC   │ │
    └─────────┘    └───────────┘    └───────────┘

4.2 VLAN and traffic segmentation

VLAN Purpose Ports MTU
VLAN 10 Management (Proxmox web UI, SSH) 1× 1 GbE BMC 1500
VLAN 20 VM traffic + Ceph public 2× 10 GbE (bond) 9000
VLAN 30 Ceph cluster (backend) 2× 10 GbE (bond) 9000

4.3 Switch

Parameter Value
Model MikroTik CRS326-24S+2Q+RM or similar L2+ switch
Ports 24× SFP+ 10 GbE
Management VLAN 10, IP 10.0.0.254/24
Features VLAN, LACP (LAG), Jumbo frames (MTU 9000), SNMP

4.4 Cabling

Type Length Quantity Purpose
SFP+ DAC (passive) 3 m 12 10 GbE connection server ↔ switch
Cat6A UTP 3 m 3 Management (1 GbE BMC)
Cat6A UTP 1 m 1 Internet uplink (patch panel)

DAC cables are cheaper than SFP+ optics + patch cords — suitable for single-rack.


5. Rack layout

5.1 Dimensions and positions

U Device Power (W)
U1 Switch 10 GbE (1U) ~60 W
U2 UPS (2U)
U3 (empty, ventilation)
U4 Server Node 1 (1U) ~250 W
U5 Server Node 2 (1U) ~250 W
U6 Server Node 3 (1U) ~250 W
U7U15 Empty (optional storage, patch panel)
Parameter Value
Rack type 15U wall-mount, 19", 600×600 mm
Total IT load ~810 W
PUE estimate ~1.5 (office room, no precision cooling)
Cooling Standard office AC (ASHRAE A2: 1035 °C). Sufficient for <1 kW.

Note: KB (DATACENTERS.md) states free air cooling for low density (<5 kW/rack). Standard ventilation and AC are sufficient in an office.

5.2 UPS

Parameter Value
Type VI (line-interactive) — per DATACENTERS.md for smaller racks
Capacity 2000 VA / 1200 W
Backup time ~1520 min at 810 W load
Output 8× C13 (for servers + switch)
Battery VRLA (cheaper) or Li-ion LFP
Management USB / SNMP card (automatic Proxmox shutdown)

Optionally can be upgraded to VFI (double-conversion) UPS for cleaner output, but VI is sufficient for demo.

5.3 PDU

1× basic 1U PDU (8× C13), 230 V / 10 A — for distribution to servers.


6. Hypervisor — Proxmox VE

6.1 Installation and configuration

Component Version / Configuration
Hypervisor Proxmox VE 8.x (Debian 12 + KVM + LXC)
Storage backend Ceph Reef / Squid (18.x) integrated in Proxmox
Cluster 3-node cluster, Corosync + PMXCFS
HA Proxmox HA — 1 node failure tolerance (remaining 2 take over VMs)
Fencing watchdog (softdog) + Proxmox HA manager

6.2 License

Item Price Note
Proxmox VE $0 Open source, full functionality without license
Proxmox community support $0 Forum, wiki
Proxmox enterprise support (optional) ~€500/host/year Can be purchased later

HYPERVISORS.md: Proxmox VE is "open source (free)", no license required.

6.3 HA setup

  • HA group: all 3 nodes, no-quorum-policy = "stop" (for demo)
  • Max VM restart: 2 attempts
  • Migration: live migration via Ceph RBD (shared storage)

7. Budget estimate

Disclaimer: KB does not contain specific component prices. The following amounts are approximate market estimates (Q2 2026, USD).

7.1 Servers (3×)

Item Qty Price/unit Total
1U rack server (basic config, without CPU/RAM/disk) 3 ~$1,200 $3,600
AMD EPYC 9224 (24C) / Intel Xeon 5418Y (16C) — per KB 3 ~$900 $2,700
RAM 128 GB (4× 32 GB DDR5-4800 RDIMM) 3 ~$600 $1,800
240 GB SATA SSD (OS) 6 ~$50 $300
960 GB SATA SSD (Ceph OSD) 9 ~$150 $1,350
Dual-port 10 GbE SFP+ NIC (e.g. Intel X710-DA2) 6 ~$120 $720
Servers total ~$10,470

7.2 Network

Item Qty Price/unit Total
MikroTik CRS326-24S+2Q+RM (24× 10GbE SFP+) 1 ~$600 $600
SFP+ DAC cable 3 m (passive) 12 ~$15 $180
Network total ~$780

7.3 Rack and power

Item Qty Price/unit Total
15U wall-mount rack 19" 1 ~$300 $300
UPS 2000 VA (line-interactive, VRLA) 1 ~$450 $450
1U PDU basic (8× C13) 1 ~$60 $60
Rack + power total ~$810

7.4 Other

Item Price
Cat6A patch cables, management ~$50
Mounting material, velcro ~$30
Shipping and installation ~$200
Other total ~$280

7.5 Total calculation

Category Amount
Servers (3× node) ~$10,470
Network (switch + cables) ~$780
Rack + power ~$810
Other ~$280
Total ~$12,340
Reserve (1015%) ~$1,2001,800
Total with reserve ~$13,500$14,100

Budget $10,000$15,000 is achievable. Using cheaper CPUs (EPYC 4124P / Xeon E-2488), it can be built for ~$8,0009,000, but with limited performance for Ceph.

Possible savings:

  • CPU: 2× EPYC 4124P (4C) + 1× more powerful node → ~$800 savings (but asymmetric cluster)
  • OSD: 2× instead of 3× SSD/node → ~$500 savings (less capacity)
  • Switch: 12-port instead of 24-port → ~$300 savings

8. Topology diagram

flowchart TB
    subgraph Rack["15U Rack (office)"]
        U1["U1: 10GbE Switch (MikroTik)"]
        U2["U2: UPS 2000 VA"]
        U4["U4: Node 1 — Proxmox + Ceph OSD"]
        U5["U5: Node 2 — Proxmox + Ceph OSD"]
        U6["U6: Node 3 — Proxmox + Ceph OSD"]
    end

    subgraph Node1["Node 1 (detail)"]
        N1_CPU["CPU: EPYC 9224 (24C)"]
        N1_RAM["RAM: 128 GB DDR5"]
        N1_OS["OS: 2× 240 GB SSD (RAID 1)"]
        N1_OSD1["OSD.0: 960 GB SSD"]
        N1_OSD2["OSD.1: 960 GB SSD"]
        N1_OSD3["OSD.2: 960 GB SSD"]
        N1_NIC["NIC: 4× 10GbE SFP+"]
        N1_BMC["BMC: 1× 1GbE"]
    end

    U1 ---|"4× 10GbE LACP<br/>(public + cluster)"| U4
    U1 ---|"4× 10GbE LACP"| U5
    U1 ---|"4× 10GbE LACP"| U6

    U4 --- N1_CPU
    U4 --- N1_RAM
    U4 --- N1_OS
    U4 --- N1_OSD1
    U4 --- N1_OSD2
    U4 --- N1_OSD3
    U4 --- N1_NIC
    U4 --- N1_BMC

    subgraph Ceph["Ceph Cluster"]
        CEPH_MON["3× MON (1 per node)"]
        CEPH_MGR["3× MGR (1 per node)"]
        CEPH_OSD["9× OSD (3 per node)"]
    end

    U4 --- CEPH_MON
    U5 --- CEPH_MON
    U6 --- CEPH_MON
    U4 --- CEPH_MGR
    U5 --- CEPH_MGR
    U6 --- CEPH_MGR
    U4 --- CEPH_OSD
    U5 --- CEPH_OSD
    U6 --- CEPH_OSD

    subgraph Proxmox["Proxmox VE Cluster"]
        PMX_HA["HA Group (3 nodes)"]
        PMX_HA --- U4
        PMX_HA --- U5
        PMX_HA --- U6
    end

    subgraph Uplink["Internet / LAN"]
        UPLINK_SW["Office LAN<br/>(1 GbE)"]
    end

    U1 ---|"1× Cat6A<br/>1 GbE"| UPLINK_SW
    U1 ---|"Internet<br/>(ISP router)"| UPLINK_SW

9. Summary and key decisions

Decision Variant Rationale
Hypervisor Proxmox VE HYPERVISORS.md: "For SME / low budget — open source, built-in Ceph, no license costs". Ideal for demo.
Storage Ceph (3× replication) STORAGE.md + SERVER-CONFIG.md: Ceph is the recommended SDS for Proxmox, 3 nodes minimum for quorum.
CPU Single-socket EPYC 9224 / Xeon 5418Y Compromise between price (Mini variant ~1 socket) and performance for Ceph (Ceph variant ~12+ cores).
Network 10 GbE SFP+ (instead of 25 GbE) KB recommends 25 GbE, but for low-cost demo 10 GbE is sufficient. The concept (public/cluster network separation) remains the same.
Rack 15U wall-mount Suitable for office, no raised floor, no precision cooling.
UPS 2000 VA line-interactive DATACENTERS.md: VI type for smaller racks. Sufficient for demo.
License Proxmox VE (free) No license costs, support can be purchased later.

Compromises compared to production deployment

  • 25 GbE → 10 GbE: lower Ceph cluster network throughput (not an issue in demo environment)
  • HDD → SSD: for Ceph OSD we choose SSD instead of HDD (higher price, better performance — demo focuses on functionality, not capacity)
  • 2× 10 GbE public + 2× 10 GbE cluster → combined on LACP: can be merged when ports are scarce, but separation is better
  • Cooling: office AC, not DC-grade precision cooling (PUE ~1.51.8)

What KB does not address (supplemented from practice)

KB does not contain specific component prices — the budget is an approximate market estimate. It also does not specify a concrete switch model with L2+ features (VLAN, LACP, Jumbo frames). Here we follow common practice for the SOHO/SME segment.


10. References from KB

  • DATACENTERS.md — rack layout, power chain, UPS types, cooling classes (ASHRAE), cabling standards
  • HYPERVISORS.md — Proxmox VE as open source variant, platform comparison, Mini variant (23 hosts), Ceph connectivity
  • SERVER-CONFIG.md — Pure Ceph variant (36 hosts), HW specification, network design, BIOS settings
  • STORAGE.md — Ceph architecture (MON/MGR/OSD, CRUSH map, BlueStore, replication), SDS overview
  • CONNECTIVITY.md — Ethernet speeds (10/25 GbE), SFP+ form factor, NIC placement, management port
  • NETWORKING.md — VLAN segmentation, MTU and jumbo frames, best practices
  • SERVER-HW.md — CPU selection (EPYC vs Xeon), RAM population (1DPC/2DPC), NUMA, form factors

Last revision: 2026-06-04